skip to Main Content

Metal Buildings

Metal Buildings for Industrial, Commercial and Agricultural

Read More

Metal Buildings Solution

Metal Buildings design from Havit Steel provides an optimized solution for your project. Our professional team is ready to serve any buildings. We can provide you with the most efficient design and construction plan, which is fast and smooth to complete construction for your steel building projects.

Metal Buildings
Steel Barn Building
Steel Barn Building
Agricultural

Steel Barn Building

Steel Barn Building has a variety of purposes on-farm, such as equipment storage or animal shelters. The barn is the…

Steel Shed Building
Steel Shed Building
Industrial

Steel Shed Building

Steel Shed building is pre-engineered steel structures that can use for storage in a variety of applications, agricultural machinery, or…

Metal Storage Building
Metal Storage Building
Agricultural

Metal Storage Building

The metal storage building is modern solutions for all your storage needs. The strength and durability of the steel structure…

Heavy Steel Workshop
Heavy Steel Workshop
Industrial

Heavy Steel Workshop

With the development of society and the economy, to meet the increasing scale of production and operation, industrial manufacturing enterprises…

Metal Buildings Specification

The metal buildings uses steel to form a load-bearing structure. Generally, beams, columns, trusses, and other components made of section steel and steel plates constitute a load-bearing structure, which together with roof, wall, and floor, form a building.

Compared with traditional concrete buildings, metal structure buildings use steel plates or section steel instead of reinforced concrete, higher strength, and better seismic resistance. And because the components can be manufactured in factories and installed on-site, the construction period is greatly reduced. Due to the reusability of steel, it can greatly reduce construction waste and become more environmentally friendly. Therefore, it is widely used in industrial buildings and civil buildings all over the world.

Advantage
1. Greatly save construction time. Construction is not affected by the season
2. Increase the use area of buildings, reduce construction waste and environmental pollution
3. Building materials can be reused, stimulating the development of other new building materials industries
4. Good seismic performance, easy to transform, flexible and convenient in use, bringing comfort and so on
5. High strength, lightweight, high safety and wealth of components, and lower building cost

Disadvantages:
1. Heat-resistant and non-fire-resistant, fire-resistant coatings are required
2. It is susceptible to corrosion, and the surface needs to be coated with anti-corrosion coatings to reduce or avoid corrosion and increase durability

Metal Buildings

Metal Building Kits

Steel Building Kits design from Havit Steel with advantage of Fast and Simple Construction, Wide Range Of Uses, Reasonable Cost, lower price than concrete building structure.

Metal Buildings Cladding

Metal Cladding System

Metal cladding system includes wall and roof cladding, skylight sheet, trim and flashing, gutter and downspout, insulation, which are essential components of metal building.

Metal Buildings

Steel Building Specs

Steel Building Specification provide the basic information about the Prefab Steel Building, which include Steel Warehouse, Industrial Workshop, Shed, and Garage Building.

We Are Here To Serve Any Type Of Metal Buildings

Please contact us. There’s a lot we can do for your steel building projects, small or large. Our team will provide you with the best quality construction solution

+86-152-05426602 sale@havitsteelstructure.com

The prefab steel workshop contains a welding workshop in zone A and B and a stamping workshop in zone C. The steel truss structure in Zone A and B is a steel column + steel truss structure with a length of 336 meters, a width of 216 meters, a truss span of 24 meters, and a column spacing of 6 meters.

steel factory building
Prefab Steel Workshop
steel workshop structure
connection node of steel truss

The workshop in Zone C is a three-span portal steel frame structure with a length of 216 meters, a width of 90 meters, and a column spacing of 8 meters. The Span is 24m+36m+30m.

steel sructure workshop
Portal Steel Frame
steel workshop connection node

There are a total of 176 box columns with a maximum weight of 8.2 tons. The processing of Steel Box Column as follows:

steel box column

The main truss has a total of 154 trusses. The single truss has a length of 24 meters and a height of 3.5 meters. The maximum ceiling height is about 14.1 meters, and the weight is about 12 tons. The main truss chords and web members are all H-shaped steel.

Main Truss Structure

There are a total of 522 sub-truss. The single-truss has a length of 24 meters, a height of 4 meters, a maximum ceiling height of 14.1 meters, and a weight of about 7.5 tons. The chord and web members of the secondary truss are H-shaped steel.

Sub-truss structure

The installation plan of Steel Truss Structure Workshop:

The steel structure building consists of two workshops, the welding workshop and the stamping workshop, which are divided into three zones, A, B, and C. Three areas can be constructed at the same time, saving construction time.

Construction sequence of Steel Truss Structure in A and B area:

The main process flow of site hoisting construction: steel column → main truss → secondary truss → roof bracing, purlin.

Construction sequence of the steel truss structure in Zone C:

The process of on-site hoisting: hoist steel column → install column bracing → hoist crane beam, and correction → roof beam → installation of roof bracing, and purlins.

The steel structure in Zone A and B is divided into two construction lines, starting from 1 axis and 15 axes. 4 sets of 25-ton trucks hoist the steel columns, and 4 sets of 45-ton trucks hoist the main roof truss due to its heavyweight. 4 sets of 30-ton truck cranes hoist the roof sub-truss, and the trusses are assembled on site. The roof trusses are assembled on-site with 4 sets of 10-ton truck cranes. After the trusses are assembled on the ground, they are directly hoisted in place by 45-ton and 30-ton truck cranes.

Workshop Layout Plan

Analysis and selection of hoisting machinery in Steel Workshop A and B:

The maximum length of the steel column is about 16 meters, and the maximum weight is about 8.2 tons. A 25-ton truck crane is selected with a boom length of 24.2 meters, a hoisting radius of 8 meters, a height of 21 meters, and a lifting weight of 8.45 tons, which fully meets the lifting requirements.

steel truss structure erection

The length of the roof’s main truss is 24 meters, the height is 3.5 meters, the maximum top elevation is about 14.1 meters, and the weight is about 12 tons. Choose a 45-ton truck crane with a boom length of 25.3 meters, a hoisting radius of 8 meters, a hoisting height of 24 meters, and a lifting weight of 14.8 tons, which fully meets the hoisting requirements.

steel truss structure installation
steel truss structure installation

The single sub-truss length is 24 meters, the height is 4 meters, the maximum ceiling height is about 14.1 meters, and the weight is about 7.5 tons. Choose a 30-ton truck with a boom of 24.4 meters and a hoisting radius of 8 meters. The hoisting height is 24 meters. The weight is 8.55 tons, which fully meets the lifting requirements.

steel truss structure
steel truss installation
steel roof truss installation
The installation of roof bracing and tie beam
steel truss structure installation
The installation of roof purlin and sag rod
Back To Top